BMRCL plans to conduct trials in underground section of Metro pink line, writes to Centre

Public TV
2 Min Read

BENGALURU: After commercial operations started on the Namma Metro Pink Line’s elevated sections, now it’s the turn of the underground section. The Bangalore Metro Rail Corporation Ltd (BMRCL) has written a letter to the Centre for trial runs along the Pink Line underground route.

The BMRCL is waiting for Centre’s permission to remove the buffer barrier installed near S G Palya Metro Station of Pink Line route. Only after permission for removal of buffer barrier is received from Centre, trial runs of the Pink line underground route will start.

The Pink Line’s elevated corridor route has already been inaugurated and is in public use. Pink Line Metro route is getting huge response with 25,000-30,000 people travelling daily. The BMRCL has made preparations to conduct trials in the tunnel route.

The buffer barrier has been installed because if train travels to the entry to the underground section from the elevated corridor happens, there will be danger. BMRCL MD P C Jaffer has said that as soon as permission for removal of buffer barrier is received, we are ready to start trial run from S G Palya to Shivajinagar.

Prime Minister Narendra Modi recently inaugurated the 7.5 km elevated corridor. Now, if permission for underground trial is received, there is a possibility that the full 21.26-km Pink Line from Kalena Agrahara to Nagawara will open in March or May next year.

Share This Article