GANDHINAGAR: Following Operation Sindoor, Prime Minister Narendra Modi is visiting his home state, Gujarat, for the first time. He will participate in events across three districts — Dahod, Kachchh and Gandhinagar — on May 26 and 27.
After addressing a public meeting on Mirzapar Road in Bhuj, Kachchh, he will pay a visit to the revered Mata Ashapura Temple. Notably, the Prime Minister will inaugurate the first 9,000 HP locomotive manufactured at the railway production unit established in Dahod, which was built with an investment of Rs 20,000 crore.
🔹પ્રધાનમંત્રી @narendramodi દાહોદ ખાતે 9000 HPનું પ્રથમ લોકોમોટિવ એન્જિન દેશને કરશે સમર્પિત
🔹દાહોદમાં મેક ઇન ઇન્ડિયા અભિગમ સાથે 20 હજાર કરોડના ખર્ચે તૈયાર થયું છે રેલવે પ્રોડક્શન યુનિટ
🔹લોકોમોટિવ એન્જિન પર લખાશે ‘મેન્યુફેક્ચરિંગ બાય દાહોદ’@AshwiniVaishnaw @Bhupendrapbjp pic.twitter.com/KWAKDCpPda
— DD News Gujarati (@DDNewsGujarati) May 21, 2025
The railway factory in Dahod, established under the PPP model, is set to manufacture 1,200 engines over the next 10 years, with plans to export them both domestically and internationally. These locomotive engines will soon be produced entirely under the 100 per cent Make in India initiative.
A key feature of these engines is their ability to carry cargo weighing up to 4,600 tonnes. For the first time, the engines will be equipped with air-conditioning and a toilet facility for the driver. Additionally, an advanced cover system has been installed to enhance safety and prevent accidents. Built at a cost of Rs 20,000 crore, the Dahod factory is currently producing four engines, all of which will proudly bear the label “Manufactured In Dahod’.
Hon’ble MR Shri @AshwiniVaishnaw inspected various aspects of Prototype locomotive (9000HP) one of the most powerful locomotives being manufactured at the Dahod Locomotive Workshop in Gujarat. pic.twitter.com/gNBHArpQpo
— Ministry of Railways (@RailMinIndia) March 1, 2025
This project is expected to generate direct and indirect employment for nearly 10,000 people in Dahod and nearby regions, providing a significant boost to the local economy. In addition, the various components required for locomotive production by the multinational company that secured the contract as the lowest bidder will open up business opportunities for suppliers in the power sector as well as small and medium-sized engineering firms.
Notably, the 9,000 HP, six-axle electric engine will have an average speed of 75 km per hour. Maintenance of this engine will be carried out at depots in Kharagpur (West Bengal), Visakhapatnam (Andhra Pradesh), Raipur (Chhattisgarh), and Pune (Maharashtra). (ANI)