BBMP fills 1,429 potholes in two days 

Public TV English
1 Min Read

BENGALURU: The Bruhat Bengaluru Mahanagara Palike (BBMP) has filled 1,429 potholes with asphalt in two days in the city.

Potholes were filled in five zones on Saturday and Sunday.

After a series of accidents, the BBMP started to fill potholes with asphalt in five of the eight zones in the city. According to reports, more number of  potholes were filled in the South, East and West zones of the city. On Saturday, potholes were filled in the Bommanahalli and Mahadevapura zones.

The BBMP says it filled 1,429 potholes in two days.

A total of 27 loads of bitumen were procured from the BBMP’s asphalt mixing unit and private units, and 570 potholes were filled on Sunday. Till  Saturday evening, the corporation procured 27 loads of bitumen and asphalt mix and filled 550 potholes. On Saturday night, the BBMP procured 17 loads of bitumen and 309 potholes were filled.

Share This Article
Exit mobile version